top of page
IMG_6074.HEIC

Argenson Project

Montreal

Major post-disaster decontamination including the complete repair of a water leak through the balconies. The work consisted of securing the affected areas, removing contaminated materials, drying and sanitizing the structure, and then correcting the source of the leak to ensure the building's durability, safety, and compliance.

Anchor Constructions © All rights reserved. 2025

bottom of page